欧美日韩中文字幕在线手机版本_911亚洲精品国内自产_97久久国产一区二区三区四区_毛片成人永久免费视频

Product Products

Contact

Sales hotline: 13615481234

Qilide Group Shandong Hongfu Technology Co., Ltd

Contact: Manager Wu

Mobile phone: 13615481234

Q Q: 2824483966

Phone: 0538-7431089

Fax: 0538-7431289

Email: gm@honfucrane.com  

website: www.fgxyysp.com

Address: Yangliu Industrial Park, Xintai City, Shandong Province

Products Location: Home - Products

  • Steel pedestal

    Steel pedestal

    13615481234

    Business nature: production-oriented

    Contact: Manager Wu

    Phone:0538-7431089

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more about product information

    Product Company Profile Location

    Information Details

    Steel pedestal

    Steel pedestal

    Analysis of the advantages and disadvantages of streamlined production beam factories and traditional beam yards

    1、 Research purpose, purpose, and significance of constructing a streamlined production beam factory

    Bridges are an important component of railway lines. Whenever there are significant changes in transportation vehicles, new requirements are put forward for bridges in terms of load capacity, span, etc., which promotes the development of bridge engineering technology. Previously, the materials used for building bridges were mainly stone and wood. In the long years, the practice of building bridges has accumulated rich experience, and the materials used in bridges have been replaced by concrete structures and steel structures. With the progress of society and the trend of economic development, the number of bridges has significantly increased. The sustainable and healthy development of China's highway transportation industry relies on the reliable utilization of concrete bridges.

    At present, there are countless railway and highway bridge beam factories in China, but they all have the disadvantage of occupying a large area. The main reason for the large footprint is that the number of beam making pedestals needs to meet the cycle from beam making to tensioning, so the quantity is large, the footprint is large, and it does not have the conditions to achieve streamlined operations.

    In response to the large land area occupied by the construction of the beam factory, the production of beams cannot achieve assembly line operation, and with the protection of land resources by the country, the principle of minimizing land use is emphasized. After conducting on-site inspections of individual projects, this project has developed a plan for the construction of a beam factory that requires less land, saves resources, and ensures the normal production of concrete beams. To solve the damage to land resources caused by the construction of the beam factory, implement the basic national policy of "cherishing and reasonably utilizing land, effectively protecting arable land" and conserving resources in China, and achieve the production of concrete beams in a streamlined manner, increase overcapacity, and reduce the number of laborers employed.

    2、 Overall budget analysis

    2.1 Economic Comparison

    ?

    The main differences between the streamlined production of beams and traditional beam yard production are that the formwork has been changed from the previous construction process of assembling formwork to a hydraulic formwork with integral disassembly and assembly, the concrete pedestal has been changed to a movable steel pedestal, and the winter construction method of steam curing to increase concrete strength, which is only used in the north in winter, has been added. The production of 2500 beams in a traditional beam yard requires a daily output of 6 beams, which requires 12 sets of templates and 60 pedestals, with an equivalent investment of approximately 10000 yuan; The production of 2500 beams (using secondary tensioning technology) by the streamlined production beam factory requires the investment of 6 sets of hydraulic templates, 24 mobile steel pedestals, steam curing and health preservation systems, and the cost of consuming electricity or gas, which needs to be calculated based on actual expenses, resulting in an increase of approximately 10000 yuan in investment. If secondary tensioning technology is not adopted and 7-day tensioning is considered, the production of 6 production lines in a streamlined manner requires the investment of 30 pedestals, which is about 10000 yuan more than the investment of traditional beam factories (mainly considering 4 production lines each equipped with 7 mobile pedestals, and the other two production lines can also see the use of joint pins, and considering the tight schedule of this project, once the temporary construction of the beam factory is completed, the production capacity will be insufficient in the later stage, affecting the schedule. Therefore, two production lines should be considered in advance, and the mobile pedestals can be put into use in the early stage. When the schedule is tight, the pedestals can be put into use after entering the site, so as to be well prepared). The increased costs are mainly reflected in the steel mobile pedestal, integral hydraulic formwork (hydraulic system), steam curing system, and the consumption of electricity. Compared with traditional beam yards, the initial cost investment of streamlined beam factories is relatively large, but the production efficiency is nearly twice that of ordinary processes (if considering the difficulty of local land acquisition and high prices, based on 2500 beam slabs, assembly line production can save 20-40 acres of land compared to traditional production).

    ?

    2.2 Capacity Comparison

    ?

    If the secondary tensioning technology is adopted (after 24 hours of steam curing of the box girder, the concrete reaches 75% of the design strength, and the pre tensioning control stress is 0.45fpk), and under the condition of a building area of 140m * 45m, the streamlined production beam factory can construct 6 production lines, each equipped with a set of hydraulic templates, 24 mobile steel pedestals, steam cured for 24 hours for pre tensioning, and the moving beam pedestals continue to be used for turnover. Each production line can guarantee one beam per day, with a monthly production of about 180 beams; If secondary tensioning is not used, the production area of the streamlined beam factory needs to be 280m * 45, with 6 production lines set up. Considering the comprehensive cost, a total of 30 mobile steel pedestals are set up. The 4 normal production lines produce 1 beam per day and 120 beams per month; The traditional beam yard is arranged according to 140 * 45, with 34 pedestals tightly arranged. Considering the requirements for steel bar binding, formwork hoisting, and tensioning time, it can produce about 60-70 pieces of beams per month. Therefore, adopting a streamlined production process for beam factories has increased efficiency by nearly twice compared to traditional beam yards, greatly shortening the prefabrication time of beam pieces, reducing the land use cycle and quantity, as well as the time for equipment such as gantry cranes to be put into use, and shortening the total construction period of bridges.

    3、 The advantages of a streamlined production beam factory

    ?

    Breaking the traditional beam making mode, focusing on "intelligence" and "informatization", practicing the concept of "green road", and configuring intelligent production lines, factory management, and industrial worker manufacturing according to the workshop production standards of modern enterprises, in order to achieve the upgrading and transformation from "field" to "factory", improve the production efficiency of beams, and enhance the quality of prefabricated beam production.

    ?

    3.1 Mobile steel pedestal

    ?

    Abandoning traditional concrete fixed pedestals, it overcomes the disadvantages of large footprint and long turnover time of pedestals. The intelligent beam factory adopts modern mobile steel pedestals, which compress the connection time between processes and realize the mobile operation of steel bar binding, pouring, and maintenance on the assembly line. Compared with the traditional lifting mode, it reduces the steel bar lifting process, improves the quality and progress of steel bar installation, and saves the time occupied by pedestals during staggered operations, greatly improving the efficiency of operations. It has detailed advantages over traditional beam factories.

    ?

    3.2 Integral hydraulic template

    ?

    Abandoning traditional modular templates and adopting modern hydraulic integral steel molds. The mold consists of a template and a hydraulic system: the template system integrates the work platform with the anchoring system, greatly enhancing the overall stiffness; Adopting an advanced synchronization system, 16 single cylinder hydraulic oil heads are combined into an intelligent hydraulic power system to achieve automation of template disassembly and assembly, reducing deformation caused by uneven force on the template during construction. Compared to traditional manual assembly templates, hydraulic templates can be disassembled and assembled in 2 hours, increasing production efficiency by 300%. The intelligent hydraulic system breaks the traditional mold removal process of knocking, tapping, and prying, and controls beam damage.

    ?

    3.3 Steam Health Preservation

    ?

    Abandoning the traditional covering spray curing process and drawing on the mature curing experience of prefabricated subway pipe segments (C50 concrete), the beam factory adopts a modern intelligent temperature controlled steam curing system. The steam curing assembly line operation area consists of a steam curing shed and variable temperature steam curing equipment: the steam curing shed is constructed according to the standard of a test constant temperature curing room, and is wrapped with a thermal insulation layer; The variable temperature steam curing technology adjusts the temperature and humidity of the steam curing room in real-time based on the temperature sensing data embedded in the beam, improving the strength and elastic modulus of concrete and achieving pre tensioning conditions as soon as possible. After the pre tensioning is completed, the ceiling of the steam curing shed is opened, and the beams are hung to the beam storage area for natural curing.

    4、 Comparison and Summary of New Beam Factory and Traditional Beam Yard

    ?

    Although the new type of beam factory has a higher initial investment cost compared to traditional beam yards (but with the promotion of technology, the increased cost of formwork and pedestals can be reused, which nearly doubles the efficiency and is worth the investment increase), it has demonstrated astonishing production efficiency in beam yards with the same building area. The traditional beam yard may only need one year to complete the work that takes two years, but the new type of beam factory may only need one year. In fact, all of these depend on its time saving in various aspects, such as the direct binding and adjustment of steel bars, the assembly and dismantling of formwork, and the pre tensioning of beams after steam curing. Moreover, it reduces the number of workers and labor intensity, eliminates the impact of worker operation errors on beam quality in the process, and achieves quality engineering. In the context of continuous innovation in science and technology, our beam field must also constantly innovate, complete tasks with high quality, and reduce the occupation and destruction of land resources, contributing our modest efforts to the green water and blue sky of our motherland.



    Steel pedestal 2019-10-30 This article has been read 503 times
    Previous:Prefabricated pedestalNext:Qualification and Honor

    Related Information

    Service Hotline

    13615481234

    Contact: Manager Wu

    13615481234 (same WeChat account)

    Q  Q:2824483966

    Phone: 0538-7431089

    Email: gm@honfucrane.com

    website: www.fgxyysp.com

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more

    about product information

    Copyright ?: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information魯ICP備16026539號(hào)-7

    欧美日韩中文字幕在线手机版本_911亚洲精品国内自产_97久久国产一区二区三区四区_毛片成人永久免费视频

            一区二区三区美女视频| 日韩国产精品大片| 久久99久久久久久久久久久| 26uuu国产电影一区二区| 亚洲一级二级三级在线免费观看| 日韩一级精品视频在线观看| 亚洲欧洲www| 激情综合网天天干| 国产精品久久久久久久久免费相片| 在线免费观看一区| 欧美高清一级片在线观看| 免费成人在线观看视频| 国产午夜精品久久| 精品视频在线免费观看| 成人免费在线播放视频| 国产麻豆成人传媒免费观看| 中文字幕综合网| 日韩欧美专区在线| 亚洲成人激情社区| 久久一夜天堂av一区二区三区| 一本色道a无线码一区v| 中文字幕不卡的av| 国产一区 二区| 亚洲激情在线播放| 久久综合狠狠综合| 久久av中文字幕片| 亚洲欧美日韩国产中文在线| 日韩精品自拍偷拍| 人禽交欧美网站| 国产精品灌醉下药二区| 欧美一个色资源| 日韩高清一区二区| 国产精品嫩草久久久久| 91精品欧美综合在线观看最新| 亚洲国产精品久久艾草纯爱 | 92国产精品观看| 91福利小视频| 亚洲欧美福利一区二区| 99久久国产综合精品麻豆| 色综合视频一区二区三区高清| 中文字幕中文字幕在线一区| 国产成a人亚洲精品| 午夜伦欧美伦电影理论片| 国产精品视频你懂的| 国产成人精品三级| 在线观看三级视频欧美| 亚洲激情在线播放| 久久久99久久| 日韩一区二区免费在线观看| 日韩激情中文字幕| 亚洲视频你懂的| 国产三级精品在线| 国产成人免费在线视频| 在线观看日韩一区| 亚洲国产一区二区在线播放| 欧美高清一级片在线观看| 欧美草草影院在线视频| 经典三级视频一区| 性欧美疯狂xxxxbbbb| 亚洲免费在线播放| 国产人久久人人人人爽| 精品国产乱码久久久久久久久 | 日韩一区欧美一区| 欧美激情在线观看视频免费| 成人av集中营| 欧美日韩精品一二三区| 日本亚洲天堂网| 亚洲在线视频一区| 亚洲黄色小说网站| 中文av一区二区| 国产日韩欧美高清| 91麻豆国产精品久久| 日韩一区国产二区欧美三区| 精品一区二区三区在线观看国产| 婷婷综合在线观看| 丝袜脚交一区二区| 亚洲午夜在线观看视频在线| 亚洲日本丝袜连裤袜办公室| 中文字幕国产一区| 国产拍揄自揄精品视频麻豆| eeuss鲁片一区二区三区在线看| 日韩视频一区二区三区| 国产一区视频在线看| 欧美日韩精品是欧美日韩精品| 久久99深爱久久99精品| 色婷婷综合久久久久中文| 爽好多水快深点欧美视频| 亚洲国产日韩a在线播放性色| 亚洲第一电影网| 亚洲高清视频的网址| 亚洲大片免费看| 性感美女久久精品| 秋霞午夜av一区二区三区| 偷拍与自拍一区| 蜜臀av一区二区在线观看| 在线中文字幕一区二区| 蜜臀a∨国产成人精品| 在线视频国内自拍亚洲视频| 九色porny丨国产精品| 欧美日韩国产一区| 国产盗摄女厕一区二区三区| 日韩午夜三级在线| 成人一级片在线观看| 欧美xxxxx裸体时装秀| 成人国产免费视频| 国产午夜亚洲精品不卡| 国产三级精品在线| 亚洲色图.com| 亚洲综合av网| 日日夜夜精品视频天天综合网| 午夜国产精品一区| 久国产精品韩国三级视频| 欧美日韩视频一区二区| 成人午夜av影视| 久久久精品人体av艺术| 亚洲国产精品99久久久久久久久| 亚洲欧洲99久久| 亚洲综合精品久久| 久久精品国产秦先生| 5858s免费视频成人| 成人av网在线| 中文字幕第一区| 亚洲免费三区一区二区| 日本午夜一区二区| 欧美一区二区三区在线电影| 91视频在线看| 亚洲欧洲在线观看av| 亚洲高清不卡在线观看| 另类综合日韩欧美亚洲| 日韩视频一区二区| 国产午夜精品一区二区| 一区二区三区精品久久久| 调教+趴+乳夹+国产+精品| 国产精品一区二区三区网站| 久久久久久久av麻豆果冻| 国产精品美女久久久久aⅴ| 亚洲h在线观看| 欧美精品电影在线播放| 91视频在线观看免费| 亚洲乱码国产乱码精品精可以看| 色综合久久久久久久久久久| 国产精品一品视频| 国产欧美日韩在线视频| 亚洲免费观看高清完整| 国内成+人亚洲+欧美+综合在线| 精品福利视频一区二区三区| 国产精品国产三级国产aⅴ原创 | 亚洲一区在线电影| 欧美日韩电影在线播放| 91同城在线观看| 亚洲最大的成人av| 欧美日韩精品一区视频| 国产午夜精品久久久久久久| 亚洲成va人在线观看| 欧美一区二区视频观看视频 | 国产精品美女一区二区| 亚洲一级不卡视频| 成人丝袜高跟foot| 亚洲精品成人a在线观看| 欧美性大战久久| 国产亚洲va综合人人澡精品| 婷婷夜色潮精品综合在线| 日韩精品最新网址| 亚洲精品国产无天堂网2021| 国产精品综合久久| 中文字幕精品一区二区精品绿巨人 | 亚洲日本va午夜在线影院| 精品伊人久久久久7777人| 国产女主播一区| 色伊人久久综合中文字幕| 91网站视频在线观看| 性欧美大战久久久久久久久| 日韩一二三区视频| 亚洲欧美激情插| 国产成人免费视频网站高清观看视频 | 国产精品毛片高清在线完整版| 捆绑变态av一区二区三区| 国产片一区二区| 日本韩国一区二区三区| 国产日韩欧美不卡| 美女www一区二区| 亚洲国产精品激情在线观看 | 精品在线免费观看| 国产精品丝袜一区| 欧美体内she精视频| 中文字幕av一区 二区| 国产伦精品一区二区三区视频青涩| 中文字幕一区二区三区在线不卡| 欧美日韩视频第一区| 自拍偷拍亚洲欧美日韩| 成人免费视频一区| 午夜精品福利一区二区蜜股av| 精品入口麻豆88视频| 亚洲成人高清在线| 久久奇米777| 久久成人久久鬼色| 亚洲丝袜自拍清纯另类| 成人一级片在线观看| 日韩高清不卡一区二区| 国产精品久久久久精k8|