• Shandong lifting machine project

            Shandong lifting machine project

            13615481234

            Business nature: production-oriented

            Contact: Manager Wu

            Phone:0538-7431089

            Address: Yangliu Industrial Park, Xintai City, Shandong Province

            Add friends to learn more about product information

            Product Company Profile Location

            Information Details

            Shandong lifting machine project

            Beam lifting machine

            Product Introduction

            The beam lifting machine can be used to lift prefabricated beams in combination with two cranes, or a single crane with dual lifting devices can be used to lift prefabricated beams. The lifting capacity of two lifting machines at the same time is generally 450 tons, and the lifting capacity of a single lifting machine can usually reach 900 tons. It is equipped with leg walking, overhead crane walking, and overhead crane lifting equipment, which can achieve all-round mechanized movements. Mainly used to lift prefabricated beams from the beam making platform to the beam storage platform, and after the maintenance of prefabricated beams is completed, they are lifted from the beam storage platform to the beam transport vehicle. As a lifting equipment, complete the assembly and disassembly of the bridge erecting machine. It is also used to construct dry bridges with low pier height.

            technical requirement

            1. Improve the positioning accuracy of prefabricated beams and reduce the impact on the structure of the lifting machine by lowering the operating speed of the lifting and running mechanisms.

            2. The internal space of the lifting machine should be large enough to meet the assembly needs of lifting prefabricated beams and bridge erecting machines.

            3. The main steel structure should be considered for disassembly and transportation while meeting the requirements of strength, stiffness, and stability.

            When using two cranes to lift prefabricated beams, it is necessary to ensure that the two machines operate synchronously.

            operation and maintenance

            1. Operators must undergo training and be qualified before they can take up their posts.

            2. Strictly follow the operating requirements and steps.

            3. Regularly inspect and maintain mechanical and electrical devices.

            4. If any problems are found, the machine should be stopped for inspection until the problem is resolved.


            Shandong lifting machine project 2019-7-25 This article has been read 843 times
            Previous:Container crane projectNext:Qualification and Honor


            Related Information


            Service Hotline

            13615481234

            Contact: Manager Wu

            13615481234 (same WeChat account)

            Q  Q:2824483966

            Phone: 0538-7431089

            Email: gm@honfucrane.com

            website: www.fgxyysp.com

            Address: Yangliu Industrial Park, Xintai City, Shandong Province

            Add friends to learn more

            about product information

            Copyright ?: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information魯ICP備16026539號-7

            亚洲成人午夜在线| 中文字幕亚洲色图| 久久久无码精品亚洲日韩软件 | 亚洲午夜无码久久久久| 亚洲一区日韩高清中文字幕亚洲| 黑人大战亚洲人精品一区| 亚洲午夜福利717| 亚洲AV区无码字幕中文色| 亚洲视频在线免费看| 亚洲 日韩 色 图网站| 国产精品亚洲专区一区| 日本亚洲成高清一区二区三区| 亚洲AV无码精品蜜桃| 国产av无码专区亚洲av毛片搜| 亚洲精品成人在线| 亚洲人成亚洲精品| 亚洲成a人片在线不卡一二三区| 久久精品国产精品亚洲人人 | 亚洲短视频在线观看| 狼人大香伊蕉国产WWW亚洲| 亚洲色欲久久久综合网| 亚洲精品国产成人| 午夜亚洲国产成人不卡在线| 亚洲成人精品久久| 久久亚洲精品国产精品| 亚洲欧美日韩综合久久久久| 国产成人亚洲精品狼色在线| 亚洲国语在线视频手机在线| 亚洲AⅤ无码一区二区三区在线| 久久久久亚洲精品美女| 亚洲视频无码高清在线| 亚洲午夜日韩高清一区| 亚洲激情在线视频| 综合偷自拍亚洲乱中文字幕| 亚洲嫩草影院久久精品| 国产成人综合亚洲| 亚洲日韩中文字幕| 爱情岛论坛亚洲品质自拍视频网站| 亚洲欧洲免费视频| 亚洲AV无码一区二三区| 亚洲精品免费在线视频|